ALL TAXES AND FEES NOW INCLUDED IN PRICES! The prices displayed for Carnival cruises are now inclusive of taxes and fees. By showing the total price while shopping, you can now see the total cost before completing your booking.
 
Support|1-888-227-6482

Search

Advanced SearchOpens new dialog
Search Tips

Carnival Splendor (SL) Fact Sheet

Published 03/12/2015 06:32 PM   |    Updated 02/01/2024 02:23 PM

Shipyard: Fincantieri Cantieri Navali Italiani, Italy
Inaugural cruise: July 2, 2008
Godmother: Myleene Klass, British celebrity, chart-topping musician/singer and television personality.
Country of registry: Panama
Cruising speed: 21 knots


Size/Capacity

  • Gross tonnage: 113,300
  • Length: 952 feet
  • Beam: 116 feet, 125 feet at pool deck
  • Maximum draft: 27 feet
  • Occupancy based on 2 guests per stateroom: 3012 (1506 staterooms)
  • Full guest occupancy: 3948
  • Passenger decks: 13
  • Space ratio: 37:1

 

Crew

  • Total officers and crew: 1150
  • Officers: International
  • Hotel and cruise staff: International

 

Accommodations
1506 Total Guest Staterooms (including 29 accessible staterooms)

  • 2 Captain's Suites
  • 10 Grand Suites
  • 42 Junior Suites, Ocean Suites and Spa Suites
  • 537 balcony staterooms
  • 6 scenic ocean view staterooms 
  • 329 ocean view staterooms
  • 551 interior staterooms
  • 8 ocean view upper/lower staterooms
  • 21 interior upper/lower staterooms

All staterooms feature: telephone, 110 AC power outlet, individual climate control, Carnival Homeā„¢ Signature Bedding Collection, hair dryer, safe, non-stocked mini bar unit and flat-screen TV


Life Saving Equipment
Grand Total Life Saving Capacity: 6205

  • 24 Life Boats (occupancy each: 150 / total occupancy: 3600)
  • 2 Rescue / Water Shuttle Boats (occupancy each: 60 / total occupancy: 120)
  • 35 Launchable Life Rafts (occupancy each: 35 / total occupancy: 1225)
  • 36 Life Rafts (occupancy each: 35 / total occupancy: 1260)


Maintenance Schedule

  • Dry Dock: 11/16/10-1/16/11
  • Dry Dock: 3/06/16-3/20/16
  • Dry Dock: 10/30/19-11/24/19
  • Dry Dock: 8/05/24-8/23/24


Ship Refurbishments and Renovations

Completed during dry dock: 10/30/19-11/24/19

  • Routine hotel maintenance
  • Cosmetic enhancements such as new carpeting and tile work in lounges and public areas
  • Addition of 218 beds/berths and 13 sets of connecting staterooms
  • Water Works replaced Twister Water Slide
  • Seafood Shack replaced the Burrito Bar on Lido Deck
  • Masala Tiger replaced Tandoori on Lido Deck
  • Aft pool on Lido Deck converted to Serenity
  • Alchemy Bar replaced the wine bar
  • Addition of Java & Juice
  • RedFrog Pub replaced the cigar bar
  • Video Arcade branded as The Warehouse
  • Cherry on Top replaced Formalities
  • Guy's Burger replaced food counter
  • BlueIguana Tequila Bar and RedFrog Rum Bar replaced two pool bars
 
Completed during dry dock: 3/06/16-3/20/16
  • Routine hotel maintenance
  • Cosmetic enhancements such as new carpeting and tile work in lounges and public areas
  • Addition of 6 new Scenic Ocean View staterooms and 2 Captain's Suites on Deck 9 forward 

 

Completed during dry dock: 11/16/10-1/16/11

  • Repairs due to the engine fire on 11/08/10

 

Was this answer helpful?