ALL TAXES AND FEES NOW INCLUDED IN PRICES! The prices displayed for Carnival cruises are now inclusive of taxes and fees. By showing the total price while shopping, you can now see the total cost before completing your booking.
 
Support|1-888-227-6482

Search

Advanced SearchOpens new dialog
Search Tips

Carnival Pride (PR) Fact Sheet

Published 03/12/2015 06:32 PM   |    Updated 06/05/2024 12:48 PM

Shipyard: Kvaerner-Masa Yards, Helsinki, Finland
Inaugural cruise: January 12, 2002
Godmother: Dr. Tamara Jernigan, Astronaut
Country of registry: Panama
Cost: $375 million
Cruising speed: 22 knots


Size/Capacity

  • Gross tonnage: 88,500
  • Length: 963 feet
  • Beam: 106 feet
  • Maximum draft: 26 feet
  • Occupancy based on 2 guests per stateroom: 2134 (1067 staterooms)
  • Full guest occupancy: 2680
  • Passenger decks: 12
  • Space ratio: 41:1

 

Crew

  • Total officers and crew: 930
  • Officers: International
  • Hotel and cruise staff: International

 

Accommodations
1067 Total Guest Staterooms (including 32 accessible staterooms)

  • 6 Grand Suites
  • 30 Ocean Suites and 2 Junior Suites
  • 10 Vista Suites
  • 634 balcony staterooms
  • 106 ocean view staterooms
  • 279 interior staterooms

All staterooms feature: telephone, 110 AC power outlet, individual climate control, Carnival Home™ Signature Bedding Collection, hair dryer, safe, non-stocked mini bar unit and flat-screen TV


Life Saving Equipment
Grand Total Lifesaving Capacity: 4520

  • 12 Lifeboats (occupancy each: 150 / total occupancy: 1800)
  • 6 Rescue / Water Shuttle Boats (occupancy each: 150 / total occupancy: 900)
  • 26 Launchable Life Rafts (occupancy each: 35 / total occupancy: 910)
  • 26 Life Rafts (occupancy each: 35 / total occupancy: 910)


Maintenance Schedule

  • Dry Dock: 12/05/04-12/19/04
  • Dry Dock: 12/02/07-12/15/07
  • Dry Dock: 11/07/10-11/20/10
  • Dry Dock: 10/19/14-11/09/14
  • Dry Dock: 2/03/19-2/16/19
  • Dry Dock: 4/26/23-5/27/23
  • Dry Dock: 3/15/26-4/08/26


Ship Refurbishments and Renovations

Completed during dry dock: 4/26/23-5/27/23

  • Routine hotel maintenance
  • New red, white and blue hull design and paint scheme
  • Cosmetic enhancements such as new carpeting and tiling, etc. in lounges and public areas
  • 5 new cabins and dedicated Chef's Table added to deck 1 (replaced lower level of Nightclub)
  • Dream's Studio added to deck 2
  • Casino expanded (removed casino bar)
  • Heroes Tribute Bar & Lounge (replaced SkyBox Bar0
  • Carnival Adventures Shop (replaced Card Room)
  • Spa Carnival rebranded as Cloud 9 Spa
  • Steakhouse rebranded as Fahrenheit 555
Completed during dry dock: 2/03/19-2/16/19
  • Routine hotel maintenance
  • Cosmetic enhancements such as new carpeting and tiling, etc. in lounges and public areas
  • Relocated and renovated the Arcade (replaced the chapel and the library)
  • The Cove (replaced original location of the arcade)

Completed during dry dock: 10/19/14-11/09/14

  • Routine hotel maintenance
  • Cosmetic enhancements such as new carpeting and tiling, etc. in lounges and public areas
  • Revamping midship pool to be resort-style pool
  • Fitness Center – new equipment and flooring
  • Guy’s Burger Joint
  • BlueIguana Cantina
  • BlueIguana Tequila Bar
  • RedFrog Rum Bar
  • Bonsai Sushi
  • WaterWorks
  • EA Sports Bar
  • Alchemy Bar
  • RedFrog Pub
  • Cherry on Top
  • Seaside Theater
  • Playlist Productions

Completed during dry dock: 11/07/10-11/20/10

  • Routine hotel maintenance
  • Cosmetic enhancements such as new carpeting, wall coverings, tile work, lighting and signage in lounges and public areas
  • Suite 6182 converted and now ADA compliant
  • Aft Lido pool area converted to Serenity Adults-Only - Deck 9

Completed during dry dock: 12/02/07-12/15/07

  • Internet WIFI access will be bow-to-stern
  • Circle C Lounge for teens (12-14) on Main Deck 4 forward.
  • New nine-hole miniature golf course on Sports Deck 11 Forward.
  • Teen Club (Club O2) on Sun Deck 10 Forward.

 

Was this answer helpful?