Carnival Glory (GL) Fact Sheet

Published 03/12/2015 06:31 PM   |    Updated 08/25/2017 03:22 PM

Shipyard: Fincantieri Cantieri Navali Italiani, Italy
Inaugural cruise: July 14, 2003
Godmother: Dr. Sally Ride, Astronaut
Country of registry: Panama
Cost: $500 million
Cruising speed: 21 knots

Size/Capacity

  • Gross tonnage: 110,000
  • Length: 952 feet
  • Beam: 116 feet; 125 feet at pool deck
  • Maximum draft: 27 feet
  • Full guest occupancy: 3756
  • Normal occupancy (based on 2 per cabin): 2980
  • Passenger decks: 13
  • Space ratio: 37:1


Crew

  • Total officers and crew: 1180
  • Officers: Italian
  • Hotel and cruise staff: International


Accommodations

  • 2 deluxe Captain’s Suites
  • 10 ocean view Grand Suites
  • 42 ocean view Ocean Suites and Junior Suites
  • 6 scenic ocean view staterooms
  • 521 ocean view balcony staterooms
  • 324 ocean view staterooms
  • 566 interior staterooms
  • 10 ocean view upper/lower staterooms
  • 11 interior upper/lower staterooms
  • 1492 total guest staterooms (26 modified for wheelchair users)

All staterooms feature: telephone, 110 AC power outlet, individual climate control, Carnival Comfort Bed Collection, hair dryer, safe, non-stocked mini bar unit and interactive flat-screen TV


Life Saving Equipment

Grand Total Life Saving Capacity: 6160

  • 24 Life Boats (occupany each: 150 / total occupancy: 3600)
  • 2 Rescue / Tender Boats (occupancy each: 60 / total occupany: 120)
  • 34 Launchable Life Rafts (occupancy each: 35 / total occupancy: 1190)
  • 35 Life Rafts (occupancy each: 35 / total occupancy: 1225)
  • 1 Life Raft (occupancy: 25)


Dry Dock Maintenance Schedule

  • Dry Dock: 1/07/06-1/20/06
  • Dry Dock: 1/31/10- 2/14/10
  • Dry Dock: 11/02/12-11/15/12
  • Dry Dock:  2/25/17-3/10/17


Ship Refurbishments and Renovations

Completed During Dry Dock: 2/25/17-3/10/17

  • Routine hotel maintenance
  • Cosmetic enhancements such as new carpeting, wall coverings, tile work, lighting in lounges and public areas
  • New Carnival Waterworks (completed post dry dock on 3/26/17)
  • Crew area renovations


Completed During Dry Dock: 11/02/12-11/15/12

  • Routine hotel maintenance
  • Cosmetic enhancements such as new carpeting, wall coverings, tile work, lighting in lounges and public areas
  • Addition of 2 new Captain’s Suites and 6 new Scenic Ocean View staterooms on Deck 9 forward.
  • Lido Restaurant: Mongolian Wok removed
  • Removed Kids’ pool
  • RedFrog Rum Bar – located Lido Deck 9 midship, pool area
  • BlueIguana Tequila Bar – located Lido Deck 9 midship, pool area
  • Alchemy Bar – located Promenade Deck 5 aft (replaced the wine bar)
  • EA Sports Bar – located on Promenade Deck 5 forward (replaced the original sports bar)
  • Guy’s Burger Joint – located Lido Deck 9 midship, pool area
  • Blue Iguana Cantina – located Lido Deck 9 midship, pool area
  • Cherry on Top – located Promenade Deck 5 forward (replaced Formalities)
  • DJ IRIE
  • Punchliners Comedy Club
  • The Taste Bar – located Promenade Deck 5 midship (replaced the Sushi Bar)
  • Hasbro, The Game Show
  • Playlist Productions

Completed During Dry Dock: 1/31/10-2/14/10

  • Carnival’s Seaside Theater – addition of an outdoor poolside LED screen on Lido Deck midship.
  • Addition of Serenity “Adults-Only”
  • Circle "C" Lounge – addition of a lounge for teens (12-14) on Atlantic Deck 4 forward.
  • 18 Family staterooms on Spa Deck converted to Balcony staterooms
  • The forward dining room will be reconfigured to allow for "Your Time Dining".
  • Addition of the Mongolian Wok on the Lido
  • Flat-screen TV’s installed in all staterooms and suites.
  • WiFi internet access now available bow to stern
Was this answer helpful?
Your rating has been submitted, please tell us how we can make this answer more useful.