Update: We are currently assessing enhanced health and safety protocols in light of COVID-19 and how they may impact our future offerings. Our actual offerings may vary from what is displayed or described here. Stay updated on current Health and Sailings Advisories.
Get important information on a privacy event that may impact you here.
Support|1-888-227-6482

Carnival Elation (EL) Fact Sheet

Published 03/12/2015 06:32 PM   |    Updated 03/24/2020 04:35 PM

Shipyard: Masa-Yards, Helsinki, Finland
Inaugural cruise: March 20, 1998
Godmother: Shari Arison Dorsman, President of the Arison Foundation and daughter of Carnival's Chairman Emeritus, Ted Arison.
Country of registry: Panama
Cost: $315,000,000.
Cruising speed: 21.0 knots


Size/Capacity

  • Gross tonnage: 71,909 tons
  • Length: 855 feet
  • Beam: 103 feet; 118 feet at pool deck
  • Maximum draft: 25 feet, 6 inches
  • Occupancy based on 2 guests per stateroom: 2190 (1095 staterooms)
  • Full guest occupancy: 2697
  • Passenger decks: 11
  • Space ratio: 33:1

 

Crew

  • Total Officers and crew: 900
  • Officers: International
  • Hotel and cruise staff: International

 

Accommodations
1095 Total Guest Staterooms (Including 34 accessible staterooms)

  • 2 Grand Vista Suites with large balcony
  • 28 Grand Suites with large balcony
  • 49 Junior Suites with standard balcony
  • 109 staterooms with standard balcony
  • 2 scenic ocean view staterooms
  • 469 ocean view staterooms
  • 417 interior staterooms
  • 19 interior upper/lower staterooms
All staterooms feature: telephone, 110 AC power outlet, individual climate control, hair dryer, non-stocked mini bar unit, Carnival Comfort Bed Collection, safe and flat-screen TV


Equipment

  • Set of dual stabilizers
  • 2 (19,000 HP) Azipod drive units
  • Diesel electric propulsion system (6 medium speed engines developing approximately 50,000 HP).


Life Saving Equipment

Grand Total Life Saving Capacity: 4496

  • 14 Life Boats (occupancy each: 150 / total occupancy: 2100
  • 4 Rescue / Water Shuttle Boats (occupancy each: 149 / total occupancy: 596)
  • 36 Launchable Life Rafts (occupancy each: 25 / total occupancy: 900)
  • 36 Life Rafts (occupancy each: 25 / total occupancy: 900)

 

Maintenance Schedule

  • Dry Dock: 4/11/99-4/25/99
  • Dry Dock: 10/29/00-11/11/00
  • Dry Dock: 3/02/03-3/15/03
  • Dry Dock: 4/08/06-4/22/06
  • Dry Dock: 2/26/09-3/11/09
  • Dry Dock: 10/22/11-11/05/11
  • Dry Dock: 9/25/14-10/09/14
  • Dry Dock: 8/31/17-10/07/17
  • Dry Dock: 3/02/20-3/25/20

 

Ship Refurbishments and Renovations
 

Completed during dry dock: 3/02/20 - 3/25/20

  • Routine hotel maintenance
  • Cosmetic enhancements in lounges and public areas such as new carpeting, wall coverings and tile work in lounges and public areas
  • Bonsai Sushi Express added to Deck 9
  • Dreams Studio replaced Special Occasions on Deck 9
  • JavaBlue Cafe replaced the Musical Cafe on Deck 9
  • Cherry on Top added to Deck 9
  • Limelight Lounge replaced Jekyll & Hyde Dance Club on Deck 9
  • Alchemy Bar replaced Gatsby's Great Bar on Deck 9
  • 30 new cabins replaced the Cole Porter Club Lounge on Deck 9
 

Completed during dry dock: 8/31/17 - 10/07/17

  • Routine hotel maintenance
  • Cosmetic enhancements in lounges and public areas such as new carpeting, wall coverings and tile work in lounges and public areas
  • Guy’s Burger Joint (replaced food service, Off the Grill and Rotisserie)
  • BlueIguana Cantina (replaced food service, Mongolian Wok)
  • RedFrog Rum Bar (replaced pool bar)
  • BlueIguana Tequila Bar (replaced pool bar)
  • Camp Ocean (replaced Camp Carnival)
  • Addition of WaterWorks on Verandah Deck 11
  • Mini-Golf Course relocated to new Deck 14
  • New deck added - Deck 14 features 36 staterooms: 2 Grand Vista Suites, 2 Scenic Ocean View staterooms, 22 Junior Suites and 10 Interior staterooms
  • 1 new interior stateroom added to Empress Deck 7and 1 new interior stateroom added to Verandah Deck 11. 

 

Completed during dry dock: 9/25/14-10/09/14

  • Routine hotel maintenance
  • Cosmetic enhancements such as new carpeting, wall covering and tile work in lounges and public areas
  • New equipment in Fitness Center and upgraded flooring and window shades
  • Updated Club O2 to be more on brand

 

Completed during dry dock: 10/22/11-11/05/11

  • Routine hotel maintenance
  • Cosmetic enhancements such as new carpeting, wall coverings, tile work, lighting in lounges and public areas
  • Suite U69 converted and now ADA compliant

 

Completed during dry dock: 2/26/09-3/11/09

  • "Circle C" Young Teens club will be added to Atlantic Deck 8 (previously, the card room), featuring a high-tech sound and lighting system, plasma-screen TVs displaying movies and music videos, a touch-screen jukebox, and gaming pods with the latest video games and consoles.
  • Serenity Adults-Only Retreat Area
  • Children's wading pool will be moved to Verandah Deck 11 aft section, replacing one of the whirlpools.
  • A variety of cosmetic enhancements such as new carpeting, wall coverings and tile work throughout the ship.
  • Internet WIFI access will be bow-to-stern
  • A Mongolian Wok station and Rotisserie will be added to the Lido Restaurant

 

Completed during dry dock: 4/08/06-4/22/06

  • New art gallery on Empress Deck.
  • New photo gallery on the Promenade Deck.
  • The 12,000 square foot Spa Carnival facility was renovated with new private treatment rooms, updated exercise equipment and a host of cosmetic
  • enhancements.
  • Variety of cosmetic upgrades that include carpeting and upholstery in various public lounges.
  • Carpeting replaced in staterooms, where needed.
Was this answer helpful?
Your rating has been submitted, please tell us how we can make this answer more useful.