Support|1-888-227-6482

Carnival Victory (VI) Fact Sheet

Published 03/12/2015 06:33 PM   |    Updated 01/16/2018 01:03 PM

Shipyard: Fincantieri Cantieri Navali Italiani, Italy
Inaugural cruise: October 15, 2000
Godmother: Mary Frank, Wife of Howard Frank, Carnival Corporation's Vice Chairman.
Country of registry:
Panama
Cost: $430 million
Cruising speed: 21 knots

Size/Capacity

  • Gross tonnage: 101,509
  • Length: 893 feet
  • Beam: 116 feet; 125 feet at pool deck
  • Maximum draft: 27 feet
  • Full guest occupancy: 3470
  • Normal occupancy (based on 2 per cabin): 2764
  • Passenger decks: 13
  • Space ratio: 37:1

Crew

  • Total officers and crew: 1090
  • Officers: Italian
  • Hotel and cruise staff: International

Accommodations

  • 2 Captain's Suites
  • 8 Grand Suites
  • 40 Ocean Suites
  • 488 Balcony staterooms
  • 6 Scenic Ocean View staterooms (6J and 6K)
  • 280 Ocean View staterooms
  • 543 Interior staterooms (including PT and 4J)
  • 15 Interior and Ocean View Upper/Lower staterooms
  • 1382 total guest staterooms (14 Fully Accessible / 29 Ambulatory Accessible)

All staterooms feature: telephone, 110 AC power outlet, individual climate control, Carnival Comfort Bed Collection, hair dryer, safe, interactive flat-screen TV and non-stocked mini bar unit. 


Life Saving Equipment

Grand Total Life Saving Capacity: 5725

  • 22 Life Boats (occupancy each: 150 / total occupancy: 3300)
  • 2 Rescue / Tender Boats (occupancy each: 60 / total occupancy: 120)
  • 30 Launchable Life Rafts (occupancy each: 35 / total occupancy: 1050)
  • 4 Launchable Life Rafts (occupancy each: 25 / total occupancy: 100)
  • 33 Life Rafts (occupancy each: 35 / total occupancy: 1155)


Maintenance Schedule

  • Dry Dock: 10/14/01-10/26/01
  • Dry Dock: 10/24/04-11/06/04
  • Dry Dock: 10/21/07-11/03/07
  • Dry Dock: 11/07/10-11/21/10
  • Dry Dock: 3/21/15-4/04/15
  • Dry Dock: 1/04/18-1/20/18


Ship Refurbishments and Renovations

Completed in service: 1/04/18-1/20/18

  • Routine hotel maintenance
  • Cosmetic enhancements such as new carpeting, wall coverings and tile work in lounges and public areas
  • Cherry on Top (replaced Special Occasions)
  • RedFrog Rum Bar (replaced pool bar on Lido Deck 9)
  • BlueIguana Tequila Bar (replaced pool bar on Lido Deck 9)
  • Guy's Burger Joint (replaced food service on Lido Deck 9)
  • BlueIguana Cantina (replaced food service on Lido Deck 9)
  • Added Bonsai Sushi Express cart (Promenade Deck 5)
  • Addition of 2 new Captain's Suites and 6 new Scenic Ocean View staterooms on Deck 9 forward; 2 Junior suites converted to Balcony (8D) fully-accessible staterooms


Completed in service: April 2016-April 2017

  • All staterooms refurbished


Completed during Dry Dock: 3/21/15-4/04/15

  • Routine hotel maintenance
  • Cosmetic enhancements such as new carpeting, wall coverings and tile work in lounges and public areas
  • Alchemy Bar – located Deck 5 aft (replaced Caspian Wine Bar)
  • SkyBox Sports Bar – located on Deck 5 midship (replaced Aegean Sports Bar)

Completed during Dry Dock: 11/07/10-11/21/10

  • Routine hotel maintenance
  • Cosmetic enhancements such as new carpeting, wall coverings, tile work, lighting and signage in lounges and public areas
  • ADA compliant updates in various areas of the ship
  • Suite 7288 converted and now ADA compliant
  • Addition of Serenity “Adults-Only” on Deck 12 and 14 forward
  • 11-Hole Mini Golf Course relocated to Deck 12 aft

Completed during Dry Dock: 10/21/07-11/03/07

  • Family Staterooms (6E) on Spa Deck 11 converted into Balcony Staterooms (8F).
  • Circle C Lounge – addition of a lounge for teens (12-14) on Sun Deck 12.
  • Spa Carnival – whirlpool was removed.
  • City Sports Park Mini Golf – addition of a 9-hole miniature golf course on Sun Deck 12.
  • Carnival Seaside Theater - addition of an outdoor poolside screen on Lido Deck midship.
Was this answer helpful?
Your rating has been submitted, please tell us how we can make this answer more useful.