Support|1-888-227-6482

Search

Advanced SearchOpens new dialog
Search Tips

Carnival Pride (PR) Fact Sheet

Published 03/12/2015 06:32 PM   |    Updated 02/01/2024 02:23 PM

Shipyard: Kvaerner-Masa Yards, Helsinki, Finland
Inaugural cruise: January 12, 2002
Godmother: Dr. Tamara Jernigan, Astronaut
Country of registry: Panama
Cost: $375 million
Cruising speed: 22 knots


Size/Capacity

  • Gross tonnage: 88,500
  • Length: 963 feet
  • Beam: 106 feet
  • Maximum draft: 26 feet
  • Occupancy based on 2 guests per stateroom: 2134 (1067 staterooms)
  • Full guest occupancy: 2680
  • Passenger decks: 12
  • Space ratio: 41:1

 

Crew

  • Total officers and crew: 930
  • Officers: International
  • Hotel and cruise staff: International

 

Accommodations
1067 Total Guest Staterooms (including 32 accessible staterooms)

  • 6 Grand Suites
  • 30 Ocean Suites and 2 Junior Suites
  • 10 Vista Suites
  • 634 balcony staterooms
  • 106 ocean view staterooms
  • 279 interior staterooms

All staterooms feature: telephone, 110 AC power outlet, individual climate control, Carnival Home™ Signature Bedding Collection, hair dryer, safe, non-stocked mini bar unit and flat-screen TV


Life Saving Equipment
Grand Total Lifesaving Capacity: 4520

  • 12 Lifeboats (occupancy each: 150 / total occupancy: 1800)
  • 6 Rescue / Water Shuttle Boats (occupancy each: 150 / total occupancy: 900)
  • 26 Launchable Life Rafts (occupancy each: 35 / total occupancy: 910)
  • 26 Life Rafts (occupancy each: 35 / total occupancy: 910)


Maintenance Schedule

  • Dry dock: 12/05/04-12/19/04
  • Dry dock: 12/02/07-12/15/07
  • Dry dock: 11/07/10-11/20/10
  • Dry dock: 10/19/14-11/09/14
  • Dry dock: 2/03/19-2/16/19
  • Dry dock: 4/26/23-5/27/23


Ship Refurbishments and Renovations

Completed during dry dock: 4/26/23-5/27/23

  • Routine hotel maintenance
  • New red, white and blue hull design and paint scheme
  • Cosmetic enhancements such as new carpeting and tiling, etc. in lounges and public areas
  • 5 new cabins and dedicated Chef's Table added to deck 1 (replaced lower level of Nightclub)
  • Dream's Studio added to deck 2
  • Casino expanded (removed casino bar)
  • Heroes Tribute Bar & Lounge (replaced SkyBox Bar0
  • Carnival Adventures Shop (replaced Card Room)
  • Spa Carnival rebranded as Cloud 9 Spa
  • Steakhouse rebranded as Fahrenheit 555
Completed during dry dock: 2/03/19-2/16/19
  • Routine hotel maintenance
  • Cosmetic enhancements such as new carpeting and tiling, etc. in lounges and public areas
  • Relocated and renovated the Arcade (replaced the chapel and the library)
  • The Cove (replaced original location of the arcade)

Completed during dry dock: 10/19/14-11/09/14

  • Routine hotel maintenance
  • Cosmetic enhancements such as new carpeting and tiling, etc. in lounges and public areas
  • Revamping midship pool to be resort-style pool
  • Fitness Center – new equipment and flooring
  • Guy’s Burger Joint
  • BlueIguana Cantina
  • BlueIguana Tequila Bar
  • RedFrog Rum Bar
  • Bonsai Sushi
  • WaterWorks
  • EA Sports Bar
  • Alchemy Bar
  • RedFrog Pub
  • Cherry on Top
  • Seaside Theater
  • Playlist Productions

Completed during dry dock: 11/07/10-11/20/10

  • Routine hotel maintenance
  • Cosmetic enhancements such as new carpeting, wall coverings, tile work, lighting and signage in lounges and public areas
  • Suite 6182 converted and now ADA compliant
  • Aft Lido pool area converted to Serenity Adults-Only - Deck 9

Completed during dry dock: 12/02/07-12/15/07

  • Internet WIFI access will be bow-to-stern
  • Circle C Lounge for teens (12-14) on Main Deck 4 forward.
  • New nine-hole miniature golf course on Sports Deck 11 Forward.
  • Teen Club (Club O2) on Sun Deck 10 Forward.

 

Was this answer helpful?