Carnival Fantasy (FA) Fact Sheet

Published 03/12/2015 06:32 PM   |    Updated 07/06/2017 10:15 AM

Shipyard: Masa-Yards, Helsinki, Finland
Inaugural cruise: March 2, 1990
Country of registry: Panama
Godmother: Tellervo Koivisto, Wife of Finland's President
Cost: $225,000,000.
Cruising speed: 21.0 knots


Size/Capacity

  • Gross tonnage: 70,367 tons
  • Length: 855 feet
  • Beam: 103 feet; 118 feet at pool deck
  • Maximum draft: 25 feet, 6 inches
  • Full guest occupancy: 2675
  • Normal occupancy (based on 2 per cabin): 2056
  • Passenger decks: 10
  • Space ratio: 34:1

Crew

  • Total Officers and crew: 920
  • Officers: Italian
  • Hotel and cruise staff: International

Accommodations

  • 28 ocean view balcony Grand Suites
  • 26 ocean view balcony Junior Suites
  • 566 ocean view twin/king staterooms
  • 389 interior twin/king staterooms
  • 19 interior upper/lower staterooms
  • 1028 Total guest staterooms (24 modified for wheelchair users)

All staterooms feature: telephone, 110 AC power outlet, individual climate control, Carnival Comfort Bed Collection, safe and flat-screen TV


Equipment

  • Set of dual stabilizers
  • 3 bow thrusters and 3 stern thrusters
  • Individually controlled twin rudders
  • Diesel electric propulsion system (6 medium speed engines developing approximately 50,000 HP).


Life Saving Equipment

Grand Total Life Saving Capacity: 4470

  • 12 Life Boats (occupancy each: 150 / total occupancy: 1800)
  • 6 Rescue/Tender Boats (occupancy each: 145 / total occupancy: 870)
  • 36 Launchable Life Rafts (occupancy each: 25 / total occupancy: 900)
  • 36 Life Rafts (occupancy each: 25 / total occupancy: 900)


Maintenance Schedule

  • Dry Dock: 9/20/98-10/04/98
  • Dry Dock: 9/14/00-9/28/00
  • Dry Dock: 9/04/03-10/05/03
  • Dry Dock: 9/08/05-9/29/05
  • Dry Dock: 9/06/08-10/03/08
  • Dry Dock: 11/26/10-12/11/10
  • Dry Dock: 1/26/13-2/08/13
  • Dry Dock: 2/06/16-2/20/16
  • Dry Dock: 1/03/19-1/16/19


Ship Refurbishments and Renovations

Renovations completed during dry dock: 2/06/16-2/20/16

  • Routine hotel maintenance
  • Cosmetic enhancements such as new carpeting and tile work in lounges and public areas
  • Guy's Burger Joint (replaced Off the Grill)
  • Blue Iguana Cantina (replaced Mongolian Wok)
  • Redfrom Rum Bar (replaced pool bar)
  • Blue Iguana Tequila Bar (replaced pool bar)
  • Added Internet Cafe (computer terminals) to the Promenade Deck 

Renovations completed during dry dock: 1/26/13-2/08/13

  • Routine hotel maintenance
  • Cosmetic enhancements such as new carpeting and tile work in lounges and public areas

Renovations completed during dry dock: 11/26/10-12/11/10

  • Routine hotel maintenance
  • Cosmetic enhancements such as new carpeting, wall coverings, tile work, lighting and signage in lounges and public areas
  • Suite U69 converted and now ADA compliant


Renovations completed during dry dock: 9/06/08-10/03/08

  • "Circle C" Young Teens club added to Atlantic Deck featuring a high-tech sound and lighting system, plasma-screen TVs displaying movies and music videos, a touch-screen jukebox, and gaming pods with the latest video games and consoles.
  • WaterWorks Aqua Park, Serenity Adults-Only Retreat Area and a Resort-Style Pool Area.
  • A variety of cosmetic enhancements such as new carpeting, wall coverings and tile work throughout the ship, including: Diningrooms, Dance Club, Shops, Lido Restaurant and Corridors.
  • Flat-screen TV's were added to all staterooms.
  • Suites were refurbished, including bathrooms.
  • 50 sets of connecting staterooms.
  • The Internet Cafe was relocated to Empress Deck midship and Wi-FI access, bow to stern.
  • Added to the Lido Restaurant: Mongolian Wok and Rotisserie

Renovations completed during dry dock 9/08/05-9/29/05

  • The 12,000 square foot Spa Carnival was completely revamped and now features 11 private treatment rooms, including two couples massage rooms, a new relaxation/waiting room as well as updated equipment, new carpeting, tile work and other cosmetic enhancements.
  • New nine-hole miniature golf course on Sun Deck.
  • New Art Gallery on Empress Deck.
  • New Photo Gallery on Promenade Deck.
  • Upgraded audio/visual equipment in a variety of public areas.
  • Variety of cosmetic upgrades that include new tile work, carpeting and upholstery throughout the ship.
  • Behind the scenes: Updated galley and laundry equipment has been installed to enhance guest service.

Renovations completed during dry dock 9/04/03-10/5/03

  • A new lobby bar including a stage where a trio will play classical music.
  • Each of the 1028 staterooms will receive a complete makeover with new wall coverings, furniture, bedding and linens. In-cabin bathrooms will be fully remodeled with updated vanities, new tile work and shampoo/soap dispensers.
  • Via Marina, the enclosed promenade will receive elegant new furniture and a decorative marble floor with carpet inlays.
  • The Forum, the conference facility, will be reconfigured so that it can be utilized as both a meeting space and entertainment venue.
  • Windows on the Sea, the Lido Restaurant will be enhanced with new tile work, carpeting and additional salad and dessert bar stations.
  • Numerous lounges and dining rooms will receive cosmetic enhancements, with new carpeting and wall coverings throughout.

Renovations completed during dry dock 9/14/00-9/28/00

  • The Promenade Deck was changed to an Ancient Roman heme
  • A new 300-seat conference center was added which replaced two-thirds of the aft lounge
  • A new Children's World was added which replaced one-third of the aft lounge. The Children's World includes: a playroom; an arts and crafts room; a computer room
  • A large amount of carpet replaced throughout the ship
  • Re-caulking of outdoor teak decks
  • Main pool retiled

Renovations completed by 3/00

  • A coffee cafe has been added to the Promenade Deck
  • Formalities Shop has been added to the Promenade Deck


Was this answer helpful?
Your rating has been submitted, please tell us how we can make this answer more useful.